Northwest Disc Golf News Forums

Go Back   Northwest Disc Golf News Forums > Disc Golf Courses > Idaho: Northern ID > Corbin Park
Register Site Rules FAQ Members List Arcade Mark Forums Read

Reply
 
Thread Tools
  #1  
Old September 4th, 2012, 06:03 PM
Rapid Fire Jack
Join Date:
April 20th, 2009
Location:
Post Falls, ID
Posts:
88
Default Hole #2 is back in play

I picked up the basket for hole #2 from the PF Parks Dept. this morning and installed it at Corbin. Scott Hilgers volunteered to move baskets later in the day, and got about half of them repositioned. He said numerous others have plugged sleeves. Looks like a work party is in order. Tee #13 also needs some serious work.
Reply With Quote
  #2  
Old September 4th, 2012, 07:14 PM
General Scales
Join Date:
May 1st, 2009
Location:
Spokane Valley Washington
Posts:
1,525
Default

Quote:
Originally Posted by Rapid Fire Jack View Post
I picked up the basket for hole #2 from the PF Parks Dept. this morning and installed it at Corbin. Scott Hilgers volunteered to move baskets later in the day, and got about half of them repositioned. He said numerous others have plugged sleeves. Looks like a work party is in order. Tee #13 also needs some serious work.
Which ones are plugged up again? As for 13, the only solution I see to this ever increasing dilemma is one of the following. To completely remove the entire pad, move it back and start over using appropriate bracing. Or come up with some sort of railroad tie bracing to place underneath it. I'm okay with either although building the new pad would be a pain but probably the best course of action.

Thanks for getting basket two back in play! Can't wait to ace it tomorrow during league.
________________________________________________________________________
"Honest work is for the downtrodden and the Polish"
Cleveland Brown
Reply With Quote
  #3  
Old September 5th, 2012, 09:51 PM
Rapid Fire Jack
Join Date:
April 20th, 2009
Location:
Post Falls, ID
Posts:
88
Default Tee #13

I'm thinking a retainer around 3 sides made with the 6x6 pressure treated timbers like we used at Cherry Hill. Space it a foot or so away from the concrete pad, and then fill the retainer with gravel, packing it underneath the concrete. Possibly add a little Quikrete as a final packing under the slab.
Reply With Quote
  #4  
Old September 6th, 2012, 09:12 AM
General Scales
Join Date:
May 1st, 2009
Location:
Spokane Valley Washington
Posts:
1,525
Default

Quote:
Originally Posted by Rapid Fire Jack View Post
I'm thinking a retainer around 3 sides made with the 6x6 pressure treated timbers like we used at Cherry Hill. Space it a foot or so away from the concrete pad, and then fill the retainer with gravel, packing it underneath the concrete. Possibly add a little Quikrete as a final packing under the slab.
Good thinking, when can we get a work party together?
________________________________________________________________________
"Honest work is for the downtrodden and the Polish"
Cleveland Brown
Reply With Quote
  #5  
Old September 8th, 2012, 09:57 PM
Rapid Fire Jack
Join Date:
April 20th, 2009
Location:
Post Falls, ID
Posts:
88
Default Corbin work party

I'd be open to it next weekend - either Saturday or Sunday - if we can get a generator (Bryan C. ?) and a couple more people to haul materials up to the site. Or possibly the last weekend of the month. Of course I will need to get the consent from the Club officers to spend a couple hundred dollars of NIDGC funds to do that, and permission from the PF Parks dept as well. I will prepare a design and materials list this week. Would be nice to clean out the rest of the plugged sleeves on the course and move some more baskets when we have a generator out there.
Reply With Quote
  #6  
Old September 9th, 2012, 11:45 AM
DoubleB
Join Date:
June 13th, 2012
Location:
Spokane, WA
Posts:
19
Default

Looks like 13 can eaisly be cleared with a gas powered pressure washer. Love the new basket positions. Having only played it for 7 months it is a nice change. I played 5 in that position once before.. goes from sure thing birdie to a par or down the hill bogie. Thanks for the work and awesome park again! NIDGC, Jack, and the PF Parks Dept. Keep it up.
________________________________________________________________________
Life before Death. Death before Honor.
Reply With Quote
  #7  
Old September 10th, 2012, 10:35 AM
DoubleB
Join Date:
June 13th, 2012
Location:
Spokane, WA
Posts:
19
Default

I mean 14.. Durrrr...
________________________________________________________________________
Life before Death. Death before Honor.
Reply With Quote
  #8  
Old September 10th, 2012, 02:42 PM
Big Red
Join Date:
September 20th, 2011
Location:
Spokane, Wa
Posts:
139
Default

i still have my generator and shop vac.
________________________________________________________________________
Frisbeetarianism is the belief that when you die, your soul goes up to the roof and gets stuck - George Carlin
Reply With Quote
  #9  
Old September 11th, 2012, 08:25 AM
General Scales
Join Date:
May 1st, 2009
Location:
Spokane Valley Washington
Posts:
1,525
Default

Do we have a list of what positions have to be dug out?
________________________________________________________________________
"Honest work is for the downtrodden and the Polish"
Cleveland Brown
Reply With Quote
  #10  
Old September 11th, 2012, 01:36 PM
ScottW
Join Date:
June 29th, 2009
Location:
Spokane Valley, WA
Posts:
411
Default

If we are able to shore up the existing teepad without having to create a whole new one would it be possible to somehow resurface the pad?...mostly to cover up a certain image that the hole is known for. If we do have to replace the cement pad then a brick pad might be an easier option to replace it with and they look slick and have good grip too.

Bengal Ridge DGC in Pocatello, ID, and LL Stub Stewart SP outside Portland have really well done brick pads that work very well. Just a thought.
Reply With Quote
  #11  
Old September 11th, 2012, 09:15 PM
Rapid Fire Jack
Join Date:
April 20th, 2009
Location:
Post Falls, ID
Posts:
88
Default

Quote:
Originally Posted by General Scales View Post
Do we have a list of what positions have to be dug out?
Yes. Scott Hilgers marked on a course map which holes he was not able to move: 3, 6, 8, 11, 12, 13, 15, 17, 18. I think some of them just need the dirt cleared from around the padlock, but I haven't inspected them yet.

Re Scott W's question - I actually just picked up some concrete resurfacing product to use in my car wash bays. I could spare enough to do a light topcoat on tee #13 and make it look new. I went over this evening and measured elevation drops around the tee, so I can calculate the wood we will need to built retainers up to grade. Also left a voice mail today for Brian Bergstom at PF Parks to see if we can get permission to proceed with the teepad work.
Reply With Quote
  #12  
Old September 12th, 2012, 01:45 PM
Yoduh
Join Date:
May 26th, 2009
Posts:
786
Default

The club should look at buying covers to protect the openings to their sleeves. I like the fixing the old teepad idea too.
________________________________________________________________________
Relax and enjoy your hair
TNT Yardworks.com
Reply With Quote
  #13  
Old September 13th, 2012, 08:15 PM
Rapid Fire Jack
Join Date:
April 20th, 2009
Location:
Post Falls, ID
Posts:
88
Default

Got permission from Brian at PF Parks to do our project on tee #13. He also is investigating the reasons behind the new pile of rocks dumped on the fairway for #12. He wasn't aware of it. Brian also said the Parks Dept. has some spare timbers that we are welcome to use at the Park, so I will stop over at their shop tomorrow and see what they have.
I agree we need some sort of covers to protect the unused sleeves. We are looking into solutions for that problem.
Reply With Quote
Reply


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT -7. The time now is 08:56 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.